Please enter full name.
Please enter product name.
Select Industry.
Email address already exists
Please enter Password.
Enter Conatct number.
Please enter company name.
Please enter date.
Enter Message
By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services
Thank you, your message has been sent.
Invalid Email.
No.25,Fourth Road,Yancheng,Jiangsu,China China
Contact Person elina zhang
Address No.25,Fourth Road, Yancheng, Jiangsu
API 6A Wellhead equipment and Christmas tree are essential for oil and gas exploitation, composed of casing head, tubing head and Christmas tree, used
Operating principle of annular preventer: Annular blowout preventer is manipulated by hydraulic control system. When it is shut off, high pressu
API 6A FC gate valve is designed and manufactured according to API 6A, 6D and NACE MRO175 Standards. The sealing surface of valve seat and gate is ov
Plug valve is an indispensable important part used to connect high pressure manifold when well cementing and fracturing operation are carried out in o
Choke valve falls into positive choke valve, needle choke valve, plunger type choke valve, cage choke valve and orifice plate choke valve. The materia
Mud-gas separator is a dedicated device that supports choke manifold Mud-gas separator is composed of separator assembly, tank level control system,
We will contact you soon .
Please select at least one Buyer/Supplier.
Please enter name.
Please select industry.
Enter Password
Please select country.
Please select state.
Please select city.
Please Enter Message.
Enter Verification Code.