FOB Price
Get Latest Price1200 ~ 1800 USD / Metric Ton ( Negotiable )
|1 Metric Ton Minimum Order
Country:
China
Model No:
-
FOB Price:
1200 ~ 1800 USD / Metric Ton ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
1200 per Metric Ton
Minimum Order Quantity:
1 Metric Ton
Packaging Detail:
INNER Plastic bag per bobbin OUTER Standard 5 ply Carton box; 6 bobbins / 36 KGS per carton - CBM
Delivery Time:
2-15 days after mass production begin
Supplying Ability:
240 Metric Ton per Day
Payment Type:
-
Product Group :
Contact Person Betty
Linyi, Shandong
Recycled polyester dty yarn **0d/*6f RW SD NIM/SIM/HIM for weaving and knitting factory price
**0D/*6F |
Bright, raw white |
**0D/**4F |
Full dull, raw white |
**0D/*8F |
Bright, raw white |
**0D/**4F |
Bright, dope dyed black |
**0D/*6F |
Bright, raw white |
**0D/**4F |
Bright, dope dyed black |
**0D/*6F |
Bright, raw white |
**0D/**8F |
Bright, dope dyed black |
**0D/**2F |
Bright, raw white |
*5D/*6F |
Semi dull, raw white |
**0D/*6F |
Bright, raw white |
**0D/*6F |
Semi dull, raw white |
**0D/**4F |
Bright, raw white |
|
|
Dear Sir or Madam,
Welcome to visit our company which is specialized in producing all kinds of polyester filament yarns including pre-oriented yarn(POY), draw textured yarn(DTY) and fully drawn yarn(FDY) with great quality and the most competitive price. Whats more, we have been collaborating with the worlds largest blanket manufacturing enterprise Linyi XinGuang Blanket Co., Ltd on developing polyester yarn products for blanket use, which has brought us lots of experience on yarn crafts. Please feel free to contact us if you have any other questions about our items. Have a nice day.
Packaging
Shipping
Country: | China |
Model No: | - |
FOB Price: | 1200 ~ 1800 / Metric Ton ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 1200 per Metric Ton |
Minimum Order Quantity: | 1 Metric Ton |
Packaging Detail: | INNER Plastic bag per bobbin OUTER Standard 5 ply Carton box; 6 bobbins / 36 KGS per carton - CBM |
Delivery Time: | 2-15 days after mass production begin |
Supplying Ability: | 240 Metric Ton per Day |
Payment Type: | - |
Product Group : | DTY |