FOB Price
Get Latest Price1000 ~ 100000 USD / Set
|1 Set Minimum Order
Country:
China
Model No:
LD/LDA
FOB Price:
1000 ~ 100000 USD / Set Get Latest Price
Place of Origin:
Henan China
Price for Minimum Order:
1000 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Electric parts are packed by strong plywood crate, others packaged in plastic woven cloth.
Delivery Time:
within 30 days after receiving deposit
Supplying Ability:
2000 Set per Year
Payment Type:
Western Union, L/C, T/T
Product Group :
Contact Person lara
Pingyuan road, Xinxiang, Henan
Overhead Bridge Cranes can be divided into two groups:
1.Top Running Bridge Cranes
2.Under Running Bridge Cranes (sometimes called under hung).
The following will take you through a brief list of topics
that should be considered. Please take a brief look and then give
us a call, and we can help lead you through the maze to the best
cost answer for your material handling needs.
A Bridge Crane system consists of three major components.
Top Running vs. Under Running
Top Running vs. Under Running is primarily determined by two factors:
The top running configuration is best used in cases where the end user has issues with headroom. The most space efficient configuration is the double girder, top running crane system. When headroom is not an issue a top or under running configuration can be used with either the double or single girder bridge crane.
Country: | China |
Model No: | LD/LDA |
FOB Price: | 1000 ~ 100000 / Set Get Latest Price |
Place of Origin: | Henan China |
Price for Minimum Order: | 1000 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Electric parts are packed by strong plywood crate, others packaged in plastic woven cloth. |
Delivery Time: | within 30 days after receiving deposit |
Supplying Ability: | 2000 Set per Year |
Payment Type: | Western Union, L/C, T/T |
Product Group : | single beam overhead crane |