FOB Price
Get Latest Price10000 USD /
|1 Minimum Order
Country:
Hong Kong
Model No:
3PSCR150V
FOB Price:
10000 USD / Get Latest Price
Place of Origin:
Shanghai, China
Price for Minimum Order:
10000
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
500
Payment Type:
-
Product Group :
-
Hong Kong
Contact Person Ms. shoy
RM 803 Futura Plaza, 111 How Ming Street, Kwun Tong, Hongkong, hk
The Vanguards Power (VP) PropSava 3 Phase (**0V to **0V) SCRF
System is an automated hybrid voltage regulator and stabiliser. The
VP PropSava uses solid state switching, transformers, sensors and
control systems; managed by a state-of-the-art digital computer
system. The VP PropSava is connected after the electric meter and
site Master Breaker Switch and before the Distribution/Fuse Box.
All power to the site/building passes through the VP PropSava.
Purpose and Use:
The purpose of the VP PropSava is to automatically control incoming
mains over or under-voltage to any site or building; and maintain
the design output voltage settings.
Where sites/buildings experience main voltage delivery over **0V,
the electrical appliance is over-powered. Power is wasted and
equipment suffers premature failure and reduced life expectancy.
There are Two Main System Types of the VP PropSava:
1. Silicon Controlled Rectifier (SCR) –Solid State Switching,
and
2. Electro–Servo (ES) –Electro–Mechanical Switching
There are Two Types of Computer Control Systems of the VP
PropSava:
1. Fixed Output Voltage –the Output Voltage is controlled by the
computer program and cannot be changed –denoted by the letter
“F”
2. Variable Output Voltage –the User may change the Output Voltage
value –denoted by the letter “V” Manufacture Time:
All our VP 3 Phase systems are custom built to the site
specifications and take 3 to 4 weeks to build. Channel
Partners:
To maintain the highest levels of customer service and safety, VP
PropSava 3 Phase Systems are only supplied to our Appointed and
trained Channel Partners. If you want to apply for Appointment,
please contact VP.
Benefits:
VP PropSava User Benefits in Over-Voltage Supply Areas:
1. Use less power and save on electricity costs
2. Reduce their CO2 footprint
3. Reduce their liability for Carbon Tax
4. Reduce the heat and stress when the electrical equipment cannot
obtain its design voltage – equipment lasts longer
5. Reduces the number of electrical breakdowns and maintenance
cost
VP PropSava User Benefits in Under-Voltage Supply Areas:
1. Receive the power needed to start and run equipment
2. Stop losses of production and productivity
3. Reduce the heat and stress caused when the electrical equipment
does not receive its design voltage – equipment lasts longer
4. Reduces the number of electrical breakdowns and maintenance
cost
What the Experts Say:
“A **0V linear appliance used on a **0V supply will take 4.3%
more current and will consume almost 9% more energy.” (UK
Electrician's Guide (IEE), *6th Edition BS***1.)
“A **0V bulb used at **0V will achieve only *5% of it's rated
life.” (UK Electrician's Guide (IEE), *6th Edition BS***1.)
“One way to reduce electricity is to install voltage optimisers.
These maintain a constant voltage in the building, avoiding the
regular variations in grid supply voltage and maintaining the
operational voltage at a constant and efficient value.” (Hywel
Davies, Technical Director of the Chartered Institution of Building
Services Engineers (UK) - Government Business Magazine August
***0)
“Parallel VS in-line systems: parallel installation (as opposed to
in-line) are cheaper and do not require shut-down to install but
are much less effective and can normally be discounted.” (Hywel
Davies, Technical Director of the Chartered Institution of Building
Services Engineers (UK) - Government Business Magazine August
***0)
Simple step-down VS full optimisation: simple step-down equipment
(a tapped transformer) is cheaper but is not effective if the mains
voltage varies over time as it often does. So generally full
voltage optimisation which maintains a constant supply voltage to
the building is justified.” (Hywel Davies, Technical Director of
the Chartered Institution of Building Services Engineers (UK) –
Government Business Magazine August ***0)
Further features concern improved security of supply such as
overload protection and by-pass facility, and energy metering and
monitoring additions.” (Hywel Davies, Technical Director of the
Chartered Institution of Building Services Engineers (UK) –
Government Business Magazine August ***0)
The VP PropSava is ONLY Power Optimisation systems that meet and
exceed all these requirements. VP PropSava Summary:
1. Reduce electricity costs, carbon emissions and carbon taxes up
to *2%, (depended on incoming voltage and equipment condition)
2. Increase your site electrical equipment lifecycle and reduce
site maintenance costs.
3. Cutting edge standard safety systems to protect User site from
transients and poor power quality:
a. *0,**0 Amps Surge Protector
b. Manual and Automatic By-Pass for site power
c. Over Temperature control
d. Overload control
e. Phase Sequence control
f. Audible and remote alarm control systems
4. Internet Power Quality measurement system to identify existing
and historic power usage.
5. *0 year guarantee and a ****0 year life cycle.
6. No maintenance on SCRF and SCRV Systems.
7. *2 milliseconds response time and better than *8% efficiency at
full load.
8. Robust system and build quality to operate in difficult
environmental conditions.
9. Inexpensive.
*0. Reliable. Production Capacity: **0 sets / month
Delivery Time: *8 to *5 days to your shippers warehouse
Country: | Hong Kong |
Model No: | 3PSCR150V |
FOB Price: | 10000 / Get Latest Price |
Place of Origin: | Shanghai, China |
Price for Minimum Order: | 10000 |
Minimum Order Quantity: | 1 |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | 500 |
Payment Type: | - |
Product Group : | - |