FOB Price
Get Latest Price( Negotiable )
|200 Piece Minimum Order
Country:
China
Model No:
010
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
CN
Price for Minimum Order:
-
Minimum Order Quantity:
200 Piece
Packaging Detail:
wooden case+shringking film
Delivery Time:
60 days for OEM, 15 days for ready goods
Supplying Ability:
3000 Piece per Week
Payment Type:
L/C, T/T
Product Group :
Contact Person Aliciamao
Wuhan, Hubei
Construction Aluminum
Formwork, Plastic Shuttering Formwork, Concrete Slab
Formwork
The company's new hollow plastic building formwork and
technology plastics are the green building materials that the
country strongly advocates for energy conservation and
environmental protection and low carbon economy. With imported
polypropylene resin as the base material, it adopts the industry's
top technology, has greater bearing strength, does not run the mold
to increase the mold, and has the characteristics of recycling,
flame retardant and waterproof, and high turnover rate. It has
become the first choice of the construction industry and can
completely replace the traditional wood. Mold, wood, and square
steel are widely used in construction, water conservancy,
hydropower, bridge and tunnel engineering.
Product
Details
Product Advantages:
1. Low average cost (can be reused for more than **0
times)
2. Safe (can load *0KN/m2)
3. Light weight (****5kg/m2)
4. Good hardness
5. High efficiency on installing &
dismantling
6. Environmental friendly
FAQ
Q: Are you a factory or trading
company?
A: Factory of pp formwork plastic formwork
Q: How can I get the sample?
A:We provide sample free of charge 2 work
days
Q: What payment terms do you do?
A: *0% T/T as down payment, the balance paid by T/T
before shipment
or **0% irrevocable L/C At sight.
Q: What is your MOQ for pp formwork plastic
formwork?
A: We have some stock for common standard
size.
Q: How long is your delivery time?
A: ****5 work days
Q: How to pack the product?
A: On pallet and carton or as customers
requirement.
Q: How many quantity can load for one *0/*0
container?
A: Depend on the different size of pp formwork plastic
formwork.
Advantages of aluminum frame plastic formwork
1. Shorten construction
period and reduce labor costs.
2. Convenient
installation and disassembly, improve construction
efficiency
3. High turnover full
recovery, average cost lower than traditional wood
molds
4. Good surface forming
effect, free of mold release agent
5. Good stability, high
bearing capacity and wide application range
6. Many turnover times,
easy to clean and maintain
7. High efficiency of
site maintenance, clean and tidy construction
site
8. Green environmental
protection, low carbon emission reduction
9. Support system is
convenient and the site is easy to manage.
*0. High standard
universality and high recycling value.
WHY YOU CHOOSE NPCT Industrial
(Hubei)CO., LTD TO BE YOUR SUPPLIER?
1. We are professional manufacturer with many years of
experiences.
2. We have advanced facilities for production, most of the products
are welded by automatic machine.
3. We have ISO***1 certificates which can assure the quality of our
products.
4. We have strong engineering team that can give best solution for
your projects.
1# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
2# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
3# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
4# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
5# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
6# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
7# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
8# Construction Aluminum Formwork, Plastic Shuttering
Formwork, Concrete Slab Formwork
Country: | China |
Model No: | 010 |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | CN |
Price for Minimum Order: | - |
Minimum Order Quantity: | 200 Piece |
Packaging Detail: | wooden case+shringking film |
Delivery Time: | 60 days for OEM, 15 days for ready goods |
Supplying Ability: | 3000 Piece per Week |
Payment Type: | L/C, T/T |
Product Group : | formwork |