FOB Price
Get Latest Price( Negotiable )
|1 Unit Minimum Order
Country:
China
Model No:
9403GYY
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Unit
Packaging Detail:
Packed in Nude
Delivery Time:
45 Working days
Supplying Ability:
200 Unit per Month
Payment Type:
T/T, L/C
Product Group :
China
Contact Person Mr. Happle
No 8001 East Jingshi Road, JiNan, Shandong
Carbon Stee Tanker Semi-Trailer for Fuel and Water | ***3GYY | ||
overall outside dimensio(mm) | Length | ****0 | |
Width | ***0 | ||
Height (unload) | ***5 | ||
Outside dimension of tank body(mm) | Length | ****0 | |
capacity(L) | ****0 | ||
Compartment | 4 | ||
GVW(kg) | ****0 | ||
vehicle total weight(kg) | ****0 | ||
rated payload(kg) | ****0 | ||
Wheel base(mm) | ***0****0****0 | ||
Tread(mm) | Tread at front | ***0 | |
Tread at rear | ***0 | ||
Front/Rear Overhang(mm) | -/***0 | ||
Approach/Departure angle(°) | -/*2 | ||
Rated payload of Vehicle saddle | ****0 | ||
Axle | BPW *2T*3 | ||
Tyres | *1R*2.5 | ||
This design is for Tanzaina | |||
OPTIONS : 1. FUEL/WATER PUMP FOR PRIME TRACTOR 2. INSULATED COVER TO BE AN INSULATED TANK |
Country: | China |
Model No: | 9403GYY |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Unit |
Packaging Detail: | Packed in Nude |
Delivery Time: | 45 Working days |
Supplying Ability: | 200 Unit per Month |
Payment Type: | T/T, L/C |
Product Group : | Steel Tankers |