FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
02
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
standard export packaging
Delivery Time:
30-60days after placed order
Supplying Ability:
5000 Ton per Month
Payment Type:
L/C, T/T
Product Group :
-
Contact Person Jack
139# Fenghuang 6Rd, Jinan, Shandong
Introduction
The Form traveler is the main equipment in the cantilever
construction method, According to the structural form can be
divided into trussed type(as diamond, triangle), Cable-stayed type,
cable-stayed type and mixed type.We are generally used the
formtraveler cantilever construction plan when the bridge crossing
the mountain valley, river channel and vehicle or ships
impassable.
Our company has eight patents in the formtraveler design,
production and construction and our formtraveler which have 3 times
technological innovation since was produced by our Company:
BY-I Group bolts structure of Formtraveler
BY-II Pin-jointed structure of Formtraveler
BY-III Pin-jointed with hydraulic driving systems of
Formtraveler
Specifications
traveler form
1 Material: Q**5 or Q**5
2 Firm and stable, little deformation
3 Cast-in-place
Traveler Form
There are 4 types of form traveler: truss type (including
horizontal chord with no counterweight, rhombus, triangular,
bowstring, etc.), cable-stayed (including triangular and
pre-stressed), profiled steel and hybrid according to form of
structure.
The rhombic form traveler designed and manufactured by Sanbo
consists of main trusses, hanging system, anchoring system,
travelling system and bottom formwork. Constructors placing **4
meters each time, and after the bridge is hardened and reaches
adequate strength, hydraulic equipment will push the form travelers
forwardly, then a new section of bridge is casted.
Construction process of cast -in-place cantilever method
Form travelers installation-Prestressing bottom panel & outer
panel adjusting-fixing bottom panel-vertical prestressed
reinforcement & piping installation- inner form & bulkhead
panel installation-top rebars colligation/ lashing-top prestressed
piping installation-concrete casting- curing - Steel strand
inserting - stressing work - concrete grout pressing - Formwork
traveler moving- forwarding to next segment.
Country: | China |
Model No: | 02 |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | standard export packaging |
Delivery Time: | 30-60days after placed order |
Supplying Ability: | 5000 Ton per Month |
Payment Type: | L/C, T/T |
Product Group : | - |