FOB Price
Get Latest Price|
2 Ton Minimum Order
Country:
China
Model No:
M1508-M1812
FOB Price:
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
2 Ton
Packaging Detail:
each film in one carton and packaged on the pallet
Delivery Time:
10-25days after getting the confirmation
Supplying Ability:
4000 Ton per Year
Payment Type:
T/T, L/C
Product Group :
-
Contact Person Nico
xingtan, Foshan, Guangdong
BOPP FILM,bopp film
BOPP THERMAL FILM**-matt film
Type of film: matt film
Description: Basic film ; EVA (Glue); both side corona treatment
Product specifications
(Type: matt film) |
Bopp ***8 |
Bopp ***2 |
Bopp ***2 |
|
Thickness(μm) |
Total |
*3 |
*7 |
*0 |
BOPP |
*5 |
*5 |
*8 |
|
EVA |
8 |
*2 |
*2 |
|
(Yield) |
m2/ton |
****0 |
****0 |
****0 |
g/m2 |
*1.*7 |
*4.*8 |
*7.*4 |
|
Width |
**0mm************0mm |
|||
Length |
**0M*************0M |
|||
Paper Core |
1 inch core or 3 inch core |
|||
Bondings |
Less than 2 |
|||
Package |
Paper box (export specification) |
Product usage
Lamination Equipment |
Dry or Wet film lamination machine |
temperature |
Normal: *0—**0°C Special: *******5°C |
pressure |
*2—*0 Mpa |
speed |
8—*0M/min |
remarks |
Special printing: thick ink, deep color, high water content, large area printing, large size paper printing |
Country: | China |
Model No: | M1508-M1812 |
FOB Price: | Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 2 Ton |
Packaging Detail: | each film in one carton and packaged on the pallet |
Delivery Time: | 10-25days after getting the confirmation |
Supplying Ability: | 4000 Ton per Year |
Payment Type: | T/T, L/C |
Product Group : | - |