FOB Price
Get Latest Price1500 ~ 20000 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
ASTE-FV
FOB Price:
1500 ~ 20000 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
1500 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
Iron Frame
Delivery Time:
45--60 working days
Supplying Ability:
30 Piece per Month
Payment Type:
PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Product Group :
Contact Person Robert
No.71 Kaiyuan, Jinan, Shandong
The fermentation tank adopt cooling jacket and two-stage cooling refrigerant control mode at the cone and cylinder. So such design and cooling method to control the flow of the cooling liquid state in fermentation tank by the size of the two-stage cooling refrigerant flow. It will improve heat transfer efficiency and cooling rate, faster cooling, and reduce cooling costs and high economic efficiency equipment commercial operation.
Technical data of fermenters | ||||||||
Items | Total Volume/L | ID/mm | OD/mm | Height/mm | Cooling area | Weight/kg | Thickness/mm | Manhole |
*0L Fermenter | *0 | **0 | **0 | ***0 | 0.*7 | *5 |
IN:
2.0 OUT:1.5 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 0.5 | *5 |
IN:
2.5 OUT:1.5 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 0.8 | **0 |
IN:
2.5 OUT:1.5 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 1 | **5 |
IN:
2.5 OUT:2 |
TOP |
**0L Fermenter | **0 | **0 | **0 | ***0 | 1.*5 | **5 |
IN: 3 OUT:2 |
Top or Side |
**0L Fermenter | **0 | **0 | **0 | ***0 | 1.6 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 | ***0 | ***0 | ***0 | 2.8 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 | ***0 | ***0 | ***0 | 3.3 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 | ***0 | ***0 | ***0 | 3.5 | **0 |
IN: 3 OUT:2 |
Top or Side |
***0L Fermenter | ***0 |
Country: | China |
Model No: | ASTE-FV |
FOB Price: | 1500 ~ 20000 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | 1500 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Iron Frame |
Delivery Time: | 45--60 working days |
Supplying Ability: | 30 Piece per Month |
Payment Type: | PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Product Group : | Beer Brewing Equipment |